Cloverleaf Integration and Implementation Services

STREAMLINED LEARNING TRACK PROGRAM (Condensed)

The Streamlined Learning Track Program helps new or existing Cloverleaf Integration Services customers quickly become productive through a structured, mentor‑supported project. By the end of the 6‑week engagement, two interfaces will be live and customer staff will have hands‑on experience developing with Cloverleaf.

Deliverables

Planning & Analysis

  • Project management and strategic integration planning
  • Hardware sizing recommendations
  • Site assessment (as needed)
  • Implementation kickoff
  • Project plan template and development guidance
  • Statement of Work

Technical Setup

  • Software installation assistance
  • Report access setup
  • Configuration support (network connectivity & communication verification)

Customer Education

  • Level 1 technical training for up to 5 participants (onsite or remote)

Design & Build

  • Analysis and design of two interfaces
  • Mentored development of two basic HL7 interfaces (one direction, one message format)
  • Review of other interface types as needed (may require contract adjustments)

Testing

  • Test plan templates
  • Testing guidance
  • Process/procedure definition guidelines

Go‑Live & Transition

  • Three days of onsite go‑live support
  • Structured transition to support
  • Project evaluation assistance

MINI–CLOVERLEAF FAST TRACK PROGRAM (Condensed)

A shorter, 2‑week engagement focused on delivering one interface with limited mentoring and knowledge transfer. Ideal for customers with a small, well‑defined scope.

Deliverables

Planning & Analysis

  • Project management assistance
  • Hardware recommendations
  • Implementation kickoff
  • Project plan guidance

Technical Setup

  • Software installation assistance
  • Configuration support (network connectivity & communication verification)

Design & Build

  • Analysis and design of one interface
  • Mentored development of one basic HL7 interface (one direction, one message format)
  • Alternate interface types may require contract adjustments

Testing & Wrap‑Up

  • Test plan templates
  • Testing guidance
  • Process/procedure guidelines
  • Project evaluation assistance

OTHER PROFESSIONAL SERVICES

Cloverleaf Migration Implementation Service

Deliverables

  • Migration project plan template and review
  • Capacity planning worksheets and analysis
  • Site analysis, including identification of custom scripts
  • System requirements verification
  • Documentation/media verification
  • Remote connectivity verification
  • Software installation and patching
  • Installation validation (directory structures, processes, connections, NetMonitor)
  • Migration of one production site (8–10 interfaces) for testing
  • Testing of up to 6 connections with customer‑approved data
  • HTML documentation for one migrated site
  • On‑call support during production migration (business hours)
  • Additional assistance as mutually agreed

SILVER PACKAGE (Enhanced Migration Support)

Deliverables

  • Custom migration project plan
  • Capacity data analysis and hardware recommendations
  • Site analysis including custom script review
  • System requirements verification
  • Documentation/media verification
  • Software installation and patching
  • Installation validation
  • Migration of up to two production sites
  • Migration of top 10 most complex interfaces with knowledge transfer
  • Testing of up to 20 connections
  • Review of new functionality
  • HTML documentation for two migrated sites
  • Support during production migration

GLOBAL MONITOR INSTALLATION

Deliverables

  • System requirements verification
  • Global Monitor installation and patching
  • Network connectivity verification
  • Installation validation
  • Creation of up to 5 users and 5 views
  • Knowledge transfer on administration and configuration

SECURITY SERVER INSTALLATION

Deliverables

  • Verification of Advanced Security requirements
  • Installation of Advanced Security and LDAP (if applicable)
  • Network connectivity verification
  • Installation validation
  • Upgrade of test environment
  • Training on certificate creation
  • Creation of up to 5 users and 3 roles
  • Assignment of certificates and access controls
  • Knowledge transfer on administration and ACL management
  • Upgrade of production environment once customer is ready

CLOVERLEAF SITE EVALUATION (Post o‑Live)

Duration: Typically 3–5 days (longer for >25 interfaces; onsite recommended). 

Evaluation Areas

  • General Design: Sites, processes, threads, message flow, documentation
  • Site Health: Errors, logs, databases
  • TCL Design: Technique, efficiency, robustness, scalability, maintainability
  • Translation Design: Technique, efficiency, robustness, scalability, maintainability
  • Performance & Capacity: Planning, efficiency improvements, future considerations
  • Enterprise Connectivity: B2B, B2A, web enablement
  • System Administration: Maintenance, SMAT/log handling, backup procedures, OS interactions
  • Alerting & Monitoring: Exception‑based notifications (email/paging)
  • Optimization Opportunities: Integration, indexing, connectivity
  • Client Concerns: Review of issues, interface‑specific analysis, future platform considerations

ADDITIONAL CONSULTING SERVICES – Professional Assist

Customized consulting support tailored to customer needs, including mentoring, troubleshooting, optimization, and best‑practice guidance.

Give us a call at (850) 920-2728 for a time to talk that’s convenient for you, or Use the form below.

 

Shopping Basket